Le Dong Offshore Gas Platform
Le Dong 22-1 is jointly developed with Le Dong 15-1.
Related Case Studies
-
Essity Case Study
-
BP BTC Pipeline Case Study
At a length of 1,768km, the Baku Tbilisi Ceyhan (BTC) Pipeline is one of the great engineering endeavours of the new millennium.
-
NORA CRUDE Oil Storge Tanks Case Study
The National Oil Reserves Agency (NORA) was established in 1995 as a subsidiary of the Irish National Petroleum Corporation Limited (INPC). NORA is...
-
BP in Amenas Case Study
The natural gas joint development project (known as the In Amenas Gas Project) which includes four primary gas fields plus the gathering and...

